Energetus was responsible for the design, construction and commissioning of the reversible hydroelectric plant of Calheta III, belonging to the Electricity Company of Madeira (EEM).

The turnkey work included the hydroelectric plant with two horizontal axis Pelton turbines, with 15 MW and 672 meters of drop each, a main pumping station with 3 variable speed centrifugal pumps with 5.1 MW and a maximum head of 750 meters, a secondary pumping station with two centrifugal pumps with 0.09 MW and a head of 80 meters and a forced and lifting pipeline, partially buried, with an average diameter of 1200 mm and an extension of more than 4 km.

The Project also includes all the electrical installation, including two step-up transformers, to deliver the energy to the 60 kV network as well as all the command and control system of the whole installation and interface with the dispatch system of EEM.

Contact us

sdr

sdr

Central Calheta III

 

sdr

Energetus

Enercontainer - Energetus power station

Enercontainer - Energetus power station

Enercontainer is an integrated electric and thermal power station for prime power production that can run 24h on either natural gasor diesel with an electric power output of 1,0 to 2,5 MW (up to 3 MW with Diesel).

Being a containerized solution, pre-built and pre-tested, it allows shorter installation times and requires less space than any other kind of power station.

  • Reduces the necessary local work
  • Easy transportation or relocation
  • Only requires access to natural gas or diesel supply

Energetus - Oman RFS

 Energetus - Oman RFS

Energetus has successfully completed its first solar project in Muscat, Oman. This 0.5MW rooftop project for Royal Flight School, one of the most prestigious school in the country main city, shows an important commitment to achieve and teach sustainability to the students and community. The project used the latest technology and highest power output modules available in the market in order to take to most advantage of the available area.”

Energetus was awarded the turn-key project for the expansion of the Belo Jardim Thermoelectric Power Plant of EDA-Eletricidade dos Açores on Terceira Island.
The expansion includes the supply of a new latest generation and highly efficient 10 MW electrical power generator set from our partner Wärtsilä.
The conclusion of the project is scheduled for the second half of 2020 and will reinforce the island’s electrical production capacity.

 

 